ABB SACE Emax 2 Series Installation, Operation And Maintenance Instructions page 180

Table of Contents

Advertisement

176 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
The following table illustrates the path from the display for viewing the measurements related
to the synchronism function:
...
Harmonic distortion
Measurements
Ekip Synchrocheck
Network Analyzer
...
The following table illustrates the measurements related to the synchronism function:
Configuration Measurement
Ext Side Voltage
Int Side Voltage
With Bar live
Ext Side Frequency
Int Side Frequency
Phase Difference
Ext Side Voltage
With Bar
dead
Int Side Voltage
(1)
For the characteristics of the voltage and frequency (internal) measurements of the Ekip Measuring, refer
to those of the Ekip Measuring module (see page 165).
The following table illustrates the path for accessing the configuration parameters of the
module from the display:
...
Network frequency
Settings
Modules
Power Controller
...
Description
Voltage measured by Ekip Synchrocheck.
Voltage measured by Ekip Measuring
Frequency measured by Ekip Synchrocheck.
Frequency measured by Ekip Measuring
Phase difference between the voltages.
Voltage measured by Ekip Synchrocheck.
Voltage measured by Ekip Measuring
Local/Remote
Local Bus
...
Ekip Synchrocheck
...
Function
Electronic accessories | 3 - Ekip Synchrocheck module
ABB | SACE Emax 2
.
(1)
.
(1)
.
(1)
Primary Voltage
Secondary Voltage
Concatenated Ref
NO Contact
Continued on the next page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents