ABB SACE Emax 2 Series Installation, Operation And Maintenance Instructions page 147

Table of Contents

Advertisement

143 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
RC test
Submenus for the test of the Rc sensor involve the command Self-test. that allows the
command to be sent to the RC sensor to check on the correct operation.
NOTE: the test is available only with sensor correctly connected, release in Rc
configuration, auxiliary power supply present.
Protection test
To perform the protection command test, follow the following procedure:
Phase
Operation
Make sure that the circuit-breaker is closed and that there are no currents
1
circulating
2
Connect a test front unit between Ekip T&P or Ekip Bluetooth
3
Start the communication with Ekip Connect
Open the Information page and select the Test command, which opens the
4
protection test page
5
Set up the test as required and verify that the release functions properly
ABB | SACE Emax 2
Ekip Touch protection release | 17 - Test

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents