Equinox Systems FS2003 User Manual page 54

Portable isp programmer
Table of Contents

Advertisement

4. Wait for the programmer to CRC check the Programming Project
The programmer performs a full CRC validation check of the entire Programming Project
stored in the programmer 'FLASH Memory Store'.
If the check is OK, the programmer goes to step (5).
If the check FAILS, the programmer will display 'Internal Image is corrupted'. Please try re-
uploading your Project Collection and then repeat the Standalone Mode process from the
beginning.
LCD Display
CHECKING IMAGE
PAGE n
5. Press the RED <YES> button again to execute the Programming Project
The Programming Project will now start to execute.
The <BUSY> LED will illuminate to denote that the programmer is active.
This may take a few seconds or a few minutes depending on the nature of the Programming
Project.
The Programming Project will either PASS or FAIL
LCD Display
Current programming
operation is displayed
6. Programming Project – PASS
If the Programming Project programs the target device without any errors:
The <PASS> LED will FLASH
The LCD will display: 'Operation Complete OK!'
Press <YES> key to program another device
LCD Display
OPERATION
COMPLETE OK
FS2003 ISP Programmer - User Guide V1.07 – 1
Buttons
Status LED
Display
Buttons
Status LED
Display
To abort the
programming
sequence at any
time, press
Buttons
Status LED
Display
Press
To program
another device.
st
September 2007
51

Advertisement

Table of Contents
loading

Table of Contents