Reassembling The Boiler - REMEHA Gas 210 ECO PRO Series Installation, User And Service Manual

High-efficiency floor-standing gas boiler
Hide thumbs Also See for Gas 210 ECO PRO Series:
Table of Contents

Advertisement

10 Maintenance
58
10.3.5

Reassembling the boiler

1. Fit all removed parts in the reverse order.
Caution
During inspection and maintenance operations, always replace all
gaskets on the parts removed.
2. Carefully open the water tap.
3. Fill the installation with water.
4. Vent the installation.
5. Top up with more water if necessary.
6. Check the tightness of the gas and water connections.
7. Put the boiler back into operation.
114494 - v.05 - 06022018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents