Reassembling The Boiler - REMEHA Quinta Ace 30 Installation And User Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

9 Maintenance
Fig.46
Checking the non-return valve
8
9
54
6
2x
7
AD-3001181-01
9.4.4
6. Dismantle the fan.
7. Remove the fan together with the gas valve unit.
8. Inspect the non-return valve and replace it in the event of a defect or
damage, or if the maintenance kit contains a non-return valve.
9. Reassemble in the reverse order.

Reassembling the boiler

1. Fit all removed parts in the reverse order.
2. Switch on the electricity supply to the boiler.
3. Open the gas valve.
4. Vent the installation.
5. Top up with more water if necessary.
6. Check the tightness of the gas and water connections.
7. Put the boiler back into operation.
7684359 - v.06 - 10012019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents