Location Of The Boiler - REMEHA Gas 210 ECO PRO Series Installation, User And Service Manual

High-efficiency floor-standing gas boiler
Hide thumbs Also See for Gas 210 ECO PRO Series:
Table of Contents

Advertisement

Fig.5
Clearance required
50
1190
600
114494 - v.05 - 06022018
5.2.2
1490
250
2100
450
450
600
The standard inspection and maintenance operations to the boiler are car­
ried out from the front. The inspection hatch on the heat exchanger is also
located here. The hydraulic connections and the flue gas outlet are located
at the front of the boiler. The control panel housing is also on the front of
the boiler.

Location of the boiler

50
1190
Use the guidelines and the required installation space as a basis for de­
termining the correct place to install the boiler.
When determining the correct installation space, take account of the
permitted position of the flue gas discharge and/or air supply outlet.
Ensure that there is sufficient space around the boiler for good access
and ease of maintenance.
Danger
It is forbidden to store, even temporarily, combustible products
and substances in or near the boiler.
Caution
The boiler must be installed in a frost-free area.
The boiler must have an earthed electrical connection.
A connection to the drain must be present for the condensate
drain close to the boiler.
A technical clearance of at least 600 mm is required at the front
(service side) of the boiler. However, we recommend that the
clearance is at least 1000 mm. We recommend a clearance of
at least 400 mm above the boiler. At least 50 mm on the left-
hand side and 250 mm on the right-hand side.
Caution
If the power supply cable is permanently connected, you must al­
ways install a main bipolar switch with an opening gap of at least 3
mm (BS EN 60335-1).
5 Before installation
2930
250
1190
1890
450
1190
250
250
AD-4000036-02
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents