Connecting The Air Supply; Electrical Connections; Recommendations; Control Unit - REMEHA Gas 210 ECO PRO Series Installation, User And Service Manual

High-efficiency floor-standing gas boiler
Hide thumbs Also See for Gas 210 ECO PRO Series:
Table of Contents

Advertisement

6 Installation
6.5

Electrical connections

34
Caution
The pipes must be flue gas-tight and corrosion-resistant.
The materials used must comply with the prevailing regulations
and standards.
The flue gas outlet pipe must be smooth and deburred.
Connect the pipes so that they are stress-free.
The pipes must not rest on the boiler or flue gas adapter.
Fit the horizontal parts sloping down towards the boiler, with a
slope of 50 mm per metre.
Maximum bracket spacing for vertical pipes is 2 m.
Maximum tilt of vertical pipes is 20 mm per meter.
Use a bracket at each connection for horizontal pipes.
6.4.9

Connecting the air supply

1. Remove the dirt trap filter from the air supply opening
2. Fit the air supply connection kit (accessory).
3. Fit the air supply pipe to the boiler.
4. Fit the air supply pipes seamlessly together.
5. Fit the subsequent air supply pipes in accordance with the manufac­
turer's instructions.
Caution
The pipes must be airtight and waterproof.
The air supply pipe must be smooth and deburred.
Connect the pipes so that they are stress-free.
Maximum bracket spacing for vertical pipes is 2 m.
Maximum tilt of vertical pipes is 20 mm per meter.
The pipes must not be resting on the boiler or air supply adapt­
er.
Fit the horizontal parts sloping down towards the air supply out­
let, (with a slope of 50 mm per metre).
Use a bracket at each connection for horizontal pipes.
6.5.1

Recommendations

Warning
Electrical connections must always be made with the power
supply disconnected and only by qualified installers.
The boiler is completely pre-wired. Never change the internal
connections of the control panel.
Make sure you establish an earth connection before connecting
the electricity.
Establish the electrical connections in accordance with:
The instructions of the current standards.
The instructions of the wiring diagrams supplied with the boiler.
The recommendations in this manual.
Separate the sensor cables from the 230 V cables.
6.5.2

Control unit

Connection voltage
Safety delay
Anti-tripping time
Pump finishing time
230 V / 50 Hz
3.5 seconds.
Can be adapted by 1-10 minutes.
Adjustable from 0 to 98 minutes or continuous­
ly (= 99 minutes), standard setting is 3 mi­
nutes.
114494 - v.05 - 06022018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents