5 Before installation
5.3
Transport
5.4
Unpacking & initial preparation
24
The boiler comes completely assembled and is delivered in packaging on
a pallet, dimensions 700 mm x 1300 mm and 1450 mm high. Without the
packaging, the boiler will fit through all standard doorways.
Thanks to the specific compartments in the underframe, it is easy to move
the boiler using a pallet truck or forklift truck.
1. Place the pallet with the boiler in the installation room.
2. Remove the retaining straps and other pieces of packaging.
3. Lift the boiler off the pallet.
4. Slide the boiler to the correct position using the handles in the un
derframe.
5. Make sure that the boiler is horizontal.
114494 - v.05 - 06022018