Installing The Boiler; Boiler Location - REMEHA P 520-13 Technical Instructions

Fuel oil/gas boilers
Hide thumbs Also See for P 520-13:
Table of Contents

Advertisement

1 Boiler location

For the assembly and because of their design, P 520 boilers require
no special base. Their closed furnace system means that the floor
need not have refractory properties. All you have to ensure is that the
floor can support the weight of the boiler when it is fitted for operation.
If the boiler location is not determined precisely, leave enough space
around the boiler to facilitate monitoring and maintenance
operations.
Boiler body *
Straight connection (not supplied) *
* 1) In order to facilitate subsequent work on the boiler(replacing the
water distributing tube etc.) use a flanged connection from the boiler
to the system, making sure you comply with minimum clearance
dimension D.
Angled connection (not supplied)
Air inlet
Air outlet
P 520
P 520-13
L
1955
M
275
C min.
300
D min.
-
8

Installing the boiler

P 520-15
P 520-17
P 520-19
2245
2445
2645
324
321
299
436
656
656
136
356
356
If A = 1.2 m (door opening side), A' = 0.5 m
If A = 0.5 m, A' = 1.2 m (door opening side) : adapt the dimensions
on the basis of the dimensions of the burner when the door is open.
B = 1.5 m : adapt the dimensions on the basis of the dimensions of
the burner.
P 520-21
P 520-23
2955
3155
324
324
936
1266
636
966
Remeha P 520
P 520-25
3355
303
1266
966
29/08/05 - 300003791-001-B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 520-15P 520-17P 520-19P 520-21P 520-23P 520-25

Table of Contents