Figure 2.1 Installation and Maintenance Clearances
Item
1
2
3
4
2.1.3 Installation Tools
The following tools are required to properly install your UPS:
•
Pallet jack / Forklift
•
Utility Knife
•
18-mm (23/32-in.) open wrench or adjustable wrench (Crescent wrench)
•
16-mm (5/8-in.) wrench or socket
•
13-mm (1/2-in.) wrench or socket
•
10-mm (3/8-in.) wrench or socket
•
#1, #2, and #3 Phillips-head screwdrivers
•
Torque wrench
18
Description
No side clearance required.
UPS (top view).
No side clearance required.
Wall or other solid surface.
Vertiv | Liebert® EXS™ Installer/User Guide