Mitsubishi Electric AE-200A Instruction Book page 50

Air conditioning control system, bacnet function
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

Object
Pulse Input Electric
Energy 1–4
*12 *13 *14
Group Apportionment
Parameter
*12 *13 *15
Interlocked Units
Apportionment Parameter
*12 *13 *15
WT07919X04
Object ID
0–999,999,999
AC_410040–43
[0.1 kWh]
0–999,999,999
AC_01xx44
[0.1 (No Units)]
0–999,999,999
AC_61aa44
[0.1 (No Units)]
Status
(1) From the building management system,
set the current value for electric energy for
the electricity meter (1 to 4) connected to
the AE-50/EW-50 built-in Pulse Input (PI)
in the "Value_Set" property. Alternatively, in
the building management system, record
the current value for electric energy for the
electricity meter (1 to 4) connected to the
AE-50/EW-50 built-in Pulse Input (PI).
(2) Operate devices connected to the electricity
meter (1 to 4) connected to the built-in pulse
input (PI) of the AE-50/EW-50 continuously
for at least two hours.
(3) In the building management system, check
(using a CSV file) to see that the electric
energy (or difference between the current
electric energy and that recorded in (1))
coincides with the reading of the metering
device of AE-200/AE-50/EW-50.
(1) From the building management system,
set the current values for apportionment
parameter (outdoor unit) for each group in a
specific group in the "Value_Set" property.
Alternatively, in the building management
system, record the current values for
apportionment parameter (outdoor unit) for
each specific group.
(2) Operate the air conditioning units in the
relevant group for at least two hours
continuously.
(3) In the building management system,
obtain apportionment parameter (outdoor
unit) for each group in the relevant group,
total the difference with the value set in
the "Value_Set" property (or the electric
energy recorded in (1)) for each energy
management block, and check (using a
CSV file) to see that this coincides with the
outdoor unit apportionment parameter of
the energy management block.
(1) From the building management system,
without registering this in a group, set
the current values for apportionment
parameter (outdoor unit) for specific OA
Processing Unit which has been set as an
interlocked unit in the "Value_Set" property.
Alternatively, in the building management
system, without registering this in a group,
record the current values for apportionment
parameter (outdoor unit) for the specific OA
Processing Unit which has been set as an
interlocked unit.
(2) Operate the relevant interlocked units
continuously for at least two hours.
(3) In the building management system,
obtain apportionment parameter (outdoor
unit) for the relevant interlocked unit, total
the difference with the value set in the
"Value_Set" property (or the apportionment
parameter recorded in (1)) for each energy
management block, and check (using a
CSV file) to see that this coincides with the
outdoor unit apportionment parameter of
the energy management block.
50
Checking procedures

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50eEw-50eAe-50aEw-50aAe-200e

Table of Contents