Mitsubishi Electric AE-200A Instruction Book page 49

Air conditioning control system, bacnet function
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

Object
Group Apportioned
Electric Energy
*12 *13 *14
Interlocked Units
Apportioned Electric
Energy
*12 *13 *14
PIcontroller Electric
Energy 1–4
*12 *13 *14
WT07919X04
Object ID
0–999,999,999
AC_01xx39
[0.1 kWh]
0–999,999,999
AC_61aa39
[0.1 kWh]
0–999,999,999
AC_41mm40–43
[0.1 kWh]
Status
(1) From the building management system, set
the current values for electric energy (indoor
unit + outdoor unit) for each group in a
specific group in the "Value_Set" property.
Alternatively, in the building management
system, record the current values for
electric energy (indoor unit + outdoor unit)
for each specific group.
(2) Operate the air conditioning units in the
relevant group continuously for at least two
hours.
(3) In the building management system, obtain
electric energy (indoor unit + outdoor
unit) for each group in the relevant group,
total the difference with the value set in
the "Value_Set" property (or the electric
energy recorded in (1)) for each energy
management block, and check (using a
CSV file) to see that this coincides with the
energy management block apportioned
electric energy.
(1) From the building management system,
without registering this in a group, set
the current values for electric energy
(indoor unit + outdoor unit) for specific OA
Processing Unit which has been set as an
interlocked unit in the "Value_Set" property.
Alternatively, in the building management
system, without registering this in a group,
record the current values for electric energy
(indoor unit + outdoor unit) for specific OA
Processing Unit which has been set as an
interlocked unit.
(2) Operate the relevant interlocked units
continuously for at least two hours.
(3) In the building management system, obtain
electric energy (indoor unit + outdoor
unit) for the relevant interlocked unit,
total the difference with the value set in
the "Value_Set" property (or the electric
energy recorded in (1)) for each energy
management block, and check (using a
CSV file) to see that this coincides with the
energy management block apportioned
electric energy.
(1) From the building management system,
set the current value for electric energy for
the electricity meter (1 to 4) connected to
the PI controller pulse input in the "Value_
Set" property. Alternatively, in the building
management system, record the current
value for electric energy for the electricity
meter (1 to 4) connected to the PI controller
pulse input.
(2) Operate devices connected to the electricity
meter (1 to 4) connected to pulse input of
the PI controller continuously for at least
two hours.
(3) In the building management system, check
(using a CSV file) to see that the electric
energy (or difference between the current
electric energy and that recorded in (1))
coincides with the reading of the metering
device of AE-200/AE-50/EW-50.
49
Checking procedures

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50eEw-50eAe-50aEw-50aAe-200e

Table of Contents