Service
This setting enables the machine validation (VAL.) and calibration (CALIBRATION) operations.
- CURRENT VAL.
○ The validation procedure allows the current value (Ampere) to be correctly detected and displa-
yed on the equipment display. The validation procedure requires the equipment to be connected
to a suitable static load.
- VOLTAGE VAL.
○ The validation procedure allows the voltage value (Volt) to be correctly detected and displayed
on the equipment display. The validation procedure requires the equipment to be connected to a
suitable static load.
- WIRE S. VAL.
○ The validation procedure allows the wire feed rate (m/min) to be correctly detected and displayed
on the equipment display.
- CALIBRATION
○ The calibration procedure allows the machine current to be calibrated.
The SERVICE procedure is not described in this manual as it can be carried out only by specialised,
suitably trained and equipped technical staff.
The testing methods and the equipment required are set out in the relevant technical standards.

6.1 OPERATING HOUR COUNTER

The menu page shows the processing hour counters.
• POWER ON = Total number of hours the machine has been on (mains powered).
• T.ARC ON = Total number of hours of welding arc on.
• P.ARC ON = Partial number of hours of welding arc on.
SET UP
POWER ON
T. ARC. ON
P. ARC ON
22
WELD THE WORLD
8/10
The reading is carried out as follows: 7 hours and (0.2x60)
7.2 h
12 minutes.
5.3 h
0.7 h