Installation - Weco WF-104 Instruction Manual

Hide thumbs Also See for WF-104:
Table of Contents

Advertisement

C
. 006.0001.0940
od
16/04/2018 V.2.25
ENGLISH
2

INSTALLATION

Read the warnings highlighted by the following symbols in the "General prescriptions for use".
1. Assemble the various units as described in the instruction manual of the power source trolley.
2. Set the welding power source ON/OFF switch to "O" unit switched off).
3. Connect the power source mains supply cable to the mains socket outlet.
4. Secure the cable bundle connectors to the wire feeder.
5. Secure the cable bundle connectors to the welding power source.
6. Connect the power supply cable of the cooling unit to the auxiliary power socket on the power
source.
7. Connect the MIG/MAG torch coolant outlet and return hoses to the coolant fittings on the wire
feeder.
8. Connect the MIG/MAG torch coolant outlet and return hoses of the cable bundle to the fittings on
the cooling unit and on the wire feeder.
9. Secure the cable bundle by fastening the locking device.
10. Connect the earth clamp plug to the power source earth socket.
11. Connect the earth clamp to the workpiece being processed.
12. Connect the MIG/MAG torch plug to the EURO TORCH welding socket.
6
WELD THE WORLD
DANGER!
Lifting and positioning
WF-104
WF-108

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wf-108

Table of Contents