Installing Carafe Tray, Cup Stand & Bezel; Water Connection - VKI Technologies Suprema Operation And Service Manual

Hot beverage system
Table of Contents

Advertisement

SUPREMA - OPERATION & SERVICE MANUAL
Installing the Carafe Tray, Cup Stand and Graphics Bezel
1. Install the carafe tray, cup stand and graphics bezel.

Water Connection

1. Connect the water supply to the coffee maker.
Note:
To simplify the initial
water connection at
your shop, we
recommend using
1/4" polytubing, and
an instant (quick
connect) fitting. For
field installation, we
recommend copper
tubing from the
source, all the way
to the coffee maker.
2. Switch the coffee maker "ON".
3. Fill the ingredient dispenser with coffee.
Suprema - Operation & Service
a) Install the carafe tray as illustrated below. Once done, install the cup stand on top
of the carafe tray.
b) Install the bezel by first inserting the tabs on bottom if it into the notches on the
door. Push the top of the bezel into the door until it clips in place.
a) Apply Teflon tape to a 3/8" plumbing fitting. If a 1/4" line is being
used, you will then need a 1/4 x 3/8" fitting.
Teflon tape should be applied in a clockwise direction, going with
the threads when tightening.
b) Thread the fitting into the inlet valve at the back of the coffee maker and tighten
with a wrench.
c) Connect the water line to the fitting.
d) Turn the water on at the source.
e) Plug the coffee maker into the wall outlet.
a) The main power switch is found on the back of the coffee maker.
b) When the power is switched "
water.
c) Check the plumbing for leaks and correct them, if necessary.
d) Check the display for any messages, and take the indicated action.
a) Open the front door of the coffee maker.
b) Lift the lid on top of the coffee maker.
c) One section of the ingredient dispenser is larger than the other. The large section is
for the coffee that is expected to have higher consumption. The smaller is for
decaffeinated or lower consumption blends.
d) Fill the ingredient dispensers by pouring coffee through the opening in the lid.
Install the carafe tray
(and grill) and the cup
stand (and grill).
Install the pre-
assembled graphics
(and pricing) bezel.
", you should hear the coffee maker filling with
ON
02-2012
Page 7 of 58

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for VKI Technologies Suprema

Table of Contents