Installation Procedures
This section describes installation of the Edge wireless terminal, PoE power injector and
surge suppression device. The installer will need to complete the following activities as
part of the installation procedure for the Edge radio.
4.1 Preparation
1. Review the system installation overview
2. Review materials supplied by installer
3. Review the Site Survey section
4.2 Configure System Operating Parameters
1. Setup test bench
2. Login with test PC
3. Restore default settings
4. Install Options Key
5. Required Network and RF settings
4. 3 Install Outdoor Equipment
1. Assemble Ethernet and RF Connections
2. Assemble radio mounting bracket.
3. Install antenna on mast
4. Install wireless system on mast
5. Align Antenna
4.4 Install In-Cabinet Equipment
1. Install PoE power injector
2. Install Ethernet surge arrestor