Step 3: Install Antenna on Mast

Follow instructions provided by the antenna manufacturer. Allow sufficient space to
mount the wireless terminal.
conditions when the threat of a lightning strike is possible.
4.3.4

Step 4: Install Wireless System on Mast

The Edge terminal must be mounted close to the antenna. using the 15 in (450 mm)
cables provided.

Hoist Equipment to Mounting Location

For safety, it is recommended to use a hoisting device to raise the Edge to the mounting
location on the tower or mast. When at the location, secure the device against
displacement by wind. The device should remain tethered until it is securely mounted to
minimize the risk to employees working below this level.
Important: Do not use the Ethernet cable to hoist the terminal. If the Ethernet cable has
been connected and weatherproofed, create the service loop and securely attach cable
to the mounting bracket to avoid any strain on the Ethernet port connection during
hoisting and installation.

Cable Supports

It is important to provide strain relief, drip loops and protection against vibration and
abrasion caused by the wind, sand etc. The installer must provide suitable cable
supports for the CAT-5 outdoor Ethernet cable, spaced at a recommended maximum of
450 mm (~18 in).

Cable Ties

If using plastic cable ties -- do not over-tighten.
70-00204-01-01
INSTALLATION GUIDELINES
: Do not install the outdoor terminal equipment during adverse weather
Proprietary Redline Communications © 2015
Page 41 of 56
May 19, 2015