Quick installation and commissioning flowchart
Identify the frame of your drive: R1...R9.
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and
required cooling air flow.
Unpack and check the drive.
Check that all necessary optional modules
and equipment are present and correct.
If the drive will be connected to another
system than symmetrically grounded TN-S
system: Check if you must disconnect the
EMC filter or ground-to-phase varistor.
Install the drive on a wall.
Route the cables.
Check the insulation of the input cable and the
motor and the motor cable.
Connect the power cables.
Task
Introduction to the manual 29
Operation principle and hardware
Type designation key
Guidelines for planning the electrical
installation
on page
81
Technical data
on page
Mechanical
installation:
examining delivery, frames R1 and R2
page 59; R3 on page 61; R4 on page 63; R5
on page 65; R6...R9 on page
IEC:
Checking the compatibility with IT
(ungrounded), corner-grounded delta,
midpoint-grounded delta and TT systems
page
116
North America:
Checking the compatibility
with IT (ungrounded), corner-grounded delta,
midpoint-grounded delta and TT systems
page
170
Mechanical installation
Guidelines for planning the electrical
installation:
Routing the cables
Electrical installation:
IEC:
Checking the insulation of the assembly
on page
114
North America:
Checking the insulation of the
assembly
on page
168
Electrical installation:
IEC:
Connecting the power cables
123
North America:
Connecting the power cables
on page
178
See
description:
on page
49
243
Unpacking and
on
67
on page
53
on page
102
on page
on
on
Need help?
Do you have a question about the ACH580-01 and is the answer not in the manual?