Connection procedure, frame R5

IP21 (UL Type 1)
1. Remove the module cover: Loosen the retaining screws with a T20 Torx
screwdriver (1a) and lift the cover from the bottom outwards (1b) and then up (1c).
Remove the box cover: Loosen the retaining screws with a screwdriver (1d) and
slide the cover downwards (1e).
IP55 (UL Type 12)
1. Remove the front cover: Loosen the retaining screws with a T20 Torx screwdriver
(1a) and lift the cover from the bottom outwards (1b) and then up (1c).
IP21 (UL Type 1)
1
1c
1b
1a
WARNING! If you install the drive on any other system than symmetrically
grounded TN-S system, see section
(ungrounded), corner-grounded delta, midpoint-grounded delta and TT systems
page
116
if you have to disconnect the EMC filter and ground-to-phase varistor.
IP21 (UL Type 1)
1
1e
Checking the compatibility with IT
Electrical installation – IEC 131
IP55 (UL Type 12)
1
1d
1c
1a
x8
1b