Download Print this page

HARVEST H1062 Assembly Manual page 6

Advertisement

Step 7
(H1072 & H1082 Only)
rd
Place the 4
tube in front of the 3
connected and secure, slide the 3
to the left and right side fo the flange on the 3
1/2" x 1-1/2" flange bolts & nuts. After the 8 bolts are tight, attached the 3/8" quicklink to each bracket as
shown. Tighten both quicklinks.
Step 8
(Discharge Head Assembly)
All tubes & flighting should now be assembled together. Now the discharge head should be attached. First
align the 5 studs on the flighting with the 5 holes in the discharge head. Fasten the discharge head to the
flighting using (5) 1/2" lock washers & (5) 1/2" lug nuts. Thread lug nuts on flat side against the lock washers.
Tighten the 5 lug nuts. Next, fasten the discharge head to the tube using (2) 1/2" x 1-1/2" flange bolts & nuts &
(6) 1/2" x 1-1/2" hex bolts & flange nuts. The flange bolts are used on the top 2 holes of the discharge head as
shown. If assembling a H1072 or H1082 the cable attachment brackets (10171) & the 3/8" quick links will
need to be mounted on both the left and right side of the tube as shown in Step 6 & 7. Tighten all 8 bolts
mounting the discharge head to the tube. Tie red flag supplied in the kit to the discharge head.
Harvest by Meridian H10XX Assembly Manual
nd
tube and connect the flighitng as shown in Step 3. After the flighting is
rd
th
& 4
tube together as shown. Mount the cable attachment brackets (10171)
nd
tube. Tighten the tubes and brackets together using (8)
Fig. 7.1
Fig. 8.1
Page 6 of 34

Advertisement

loading

This manual is also suitable for:

H1072H1082