Download Print this page

HARVEST H1062 Assembly Manual page 19

Advertisement

Step 29
To tighten the cables, lifting the discharge end of the tubes is required. Place a lifting strap 2 feet from the end
of the auger and lift the tubes approximently 3 feet. This will cause the tubes to curve upwards. Place a punch
or pry bar into the eye of the eyebolt to hold it straight. Tighten the nut on the eyebolt about 3" or until the
cable feels stiff. Do this for all the cables. (4 cables on an H1062 & H1072; 6 cables on an H1082)
Fig. 29.1
Step 30
When all the eyebolts are tightened it is now time to tighten the truss cable clamps. Tighten each cable clamp
that is mounted to each truss evenly. (6 cable clamps on an H1062 & H1072; 10 cable clamps on an H1082)
After the clamps are tightened, stabilize the auger and lower the discharge end of the auger. Once lowered, the
auger shoud have a bow of 3" to 4" off of the assembly stand.
Fig. 30.1
Harvest by Meridian H10XX Assembly Manual
Fig. 29.2
Fig. 30.2
Page 19 of 34

Advertisement

loading

This manual is also suitable for:

H1072H1082