Installing the Series 8 IOTA on the Panel

Prerequisites

Panel for mounting IOTA is installed in a cabinet or desired mounting location.
Power supply is installed.
All wiring and pre-fabricated cables are available and labeled as applicable.
Ensure all power is turned off at the installation location.
You have the mounting hardware supplied with the components.

Considerations

You can use a redundant IOTA to support a non-redundant Series 8 IOM application.
Ensure to install the non-redundant Series 8 IOM in the upper IOM location on the
IOTA.
Ensure the enclosure is connected to a protective earth ground using #8 AWG solid
copper wire.

Mounting the IOTA

Step
1
Select desired mounting location on carrier and align mounting holes in
IOTA with screw-hole locations on the carrier. Ensure component side of
IOTA is facing up.
IOTA Model Number
8X-TCNTA1
8X-TAIXA1
8X-TAIXB1
8X-TAIDA1
8X-TAIDB1
8X-TAOXA1
8X-TAOXB1
8X-TAIMA1
8X-TDILA1
8X-TDILB1
8X-TDODA1
R500
April 2017
3. Series 8 I/O Installation and Upgrades
3.3. Installing the Series 8 IOTA on the Panel
Action
Size
9 inch
6 inch
12 inch
9 inch
12 inch
6 inch
12 inch
9 inch
9 inch
12 inch
9 inch
Series 8 I/O User's Guide
Honeywell
Number of Screws
6
4
6
6
6
4
6
5
5
6
5
43