The C300 is not present.
The IOM device is not present.
The IOC's associated IOM block has not been previously loaded.

Reloading the CM from Project or Monitoring

Reloading a CM from the Monitoring tab or the Project tab:
reloads IOC blocks to their associated IOM devices, and
reloads the standard Experion blocks within the CM to the assigned CEE
Upload error conditions
The following conditions return/reload operation errors:
The C300 is not present.
The IOM is not present.
The CM is ACTIVE.
R500
April 2017

Figure 64 Loading the CM

Series 8 I/O User's Guide
Honeywell
8. Series 8 I/O Loading
8.6. Setting Priority IOMs
235