Lifting & Placing - Grizzly G0845P Owner's Manual

Heavy-duty 50" electric metal shear
Table of Contents

Advertisement

Lifting & Placing
This is an extremely heavy machine! Serious
personal injury or death may occur if safe
lifting and moving methods are not fol-
lowed. To be safe, you will need assistance
and power equipment when moving the
shipping crate and removing the machine
from the crate. Seek assistance from a
professional rigger if you are unsure about
your abilities or maximum load ratings of
your lifting equipment.
DO NOT attempt to lift or move machine without
using proper lifting equipment (such as forklift or
crane) and assistance from other people. Each
piece of lifting equipment must be rated for at
least 4000 lbs. to support dynamic loads that
may be applied while lifting.
Review the Power Supply section beginning on
Page 10, then prepare a permanent location for
the machine.
Note: Place the G0845P on a level concrete floor.
Position the machine to provide clear access for
the loading and unloading areas (refer to Site
Considerations on Page 17).
Items Needed
Forklift (Rated For At Least 4000 lbs.) .............. 1
Wrench or Socket 18mm ................................... 1
Another Person .................................................. 1
To move machine:
1.
Remove shipping crate and accessories box.
-18-
2.
Remove (2) hex nuts and (1) flat washer on
each mounting foot (see Figure 12).
Remove
Pallet
Figure 12. Remove hex nuts and flat washers
3.
Carefully slide forklift forks under machine
base (see Figure 13).
Qty
Figure 13. Lifting the Model G0845P.
4.
Lift machine enough to just clear shipping
pallet.
5.
Move machine to prepared location.
securing machine to pallet.
Model G0845P (Mfd. Since 01/18)
Do Not
Remove
Mounting
Foot

Advertisement

Table of Contents
loading

Table of Contents