Test Run - Grizzly G0845P Owner's Manual

Heavy-duty 50" electric metal shear
Table of Contents

Advertisement

4.
Make sure wires have enough slack so they
are not pulled tight or stretched.
5.
Close and secure electrical box door, then
perform Test Run.
Connecting to Power Source
Move the disconnect switch handle to the ON
position, as illustrated below. The machine is now
connected to the power source.
Figure 21. Connecting power to machine.
Disconnecting from Power Source
Move the disconnect switch handle to the OFF
position, as illustrated below. The machine is now
disconnected from the power source.
Note: Lock the switch in the OFF position to
restrict others from starting the machine.
Figure 22. Disconnecting power from machine.
-22-

Test Run

Once assembly is complete, test run the machine
to ensure it is properly connected to power and
safety components are functioning correctly.
If you find an unusual problem during the test run,
immediately stop the machine, disconnect it from
power, and fix the problem BEFORE operating the
machine again. The Troubleshooting table in the
SERVICE section of this manual can help.
Serious injury or death can result from
using this machine BEFORE understanding
its controls and related safety information.
DO NOT operate, or allow others to operate,
machine until the information is understood.
DO NOT start machine until all preceding
setup instructions have been performed.
Operating an improperly set up machine
may result in malfunction or unexpect-
ed results that can lead to serious injury,
death, or machine/property damage.
The test run consists of the following: 1) the motor
powers up and runs correctly, 2) the phase polar-
ity is correct, 3) the shear blades have adequate
clearance, and 4) the safety feature works cor-
rectly on both EMERGENCY STOP buttons.
To test run shear:
1.
Clear all setup tools away from machine.
Model G0845P (Mfd. Since 01/18)

Advertisement

Table of Contents
loading

Table of Contents