Procedures Before System Operation; Procedures Before Operation - Mitsubishi Electric A1SJ71PB96F User Manual

Melsec a series, profibus modules, a(1s)j71pb96f
Table of Contents

Advertisement

5. PROCEDURES BEFORE SYSTEM OPERATION

5. PROCEDURES BEFORE SYSTEM
OPERATION
5.1

Procedures before Operation

The procedure for newly connecting AJ71PB96F/A1SJ71PB96F to an existing PROFIBUS-FMS
network is explained below.
Install the AJ71PB96F/A1SJ71PB96F in the PC base unit.
Connect the AJ71PB96F/A1SJ71PB96F and the network
Put the AJ71PB96F/A1SJ71PB96F in self-diagnosis mode
and turn onthe PC power supply to conduct a self-diagnosis
of the AJ71PB96F/A1SJ71PB96F. (refer to Section 5.4.)
* Parameter
Bus parameter
CRL information
Local OD
Set the AJ71PB96F/A1SJ71PB96F to the parameter setting mode.
Reset the PC CPU and set the AJ71PB96F/A1SJ71PB96F
parameter. When setting the SW0IX-PR0FPE is required.
SW0IX-PROFPE and acquire the partner station OD.
At this time, the acquired OD information is not stored
Startup
with a twisted pair cable.
Turn the PC CPU key switch to stop.
Is the AJ71PB96F/
A1SJ71PB96F normal?
Yes
Is parameter* setting required?
Yes
Acquire the
partner station OD information
online?
Yes
Set the AJ71PB96F/A1SJ71PB96F in online mode
and reset the PC CPU.
Establish a connection between the AJ71PB96F/
A1SJ71PB96F and the partner station using the
in the AJ71PB96F/A1SJ71PB96F, so be careful.
No
This is a hardware error, so contact the
nearest Mitsubishi Electric dealer and
explain the symptoms to the dealer.
No
No
5-1
MELSEC-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj71pb96f

Table of Contents