Download  Print this page

Chapter6 Procedures And Settings Before; System Operation 6 - 1 To; Procedures And Settings Before System Operation; Procedure From Module Installation To System Operation - Mitsubishi Electric MELSEC QS SERIES User Manual

Programmable controller cc-link safety system remote i/o module.
Hide thumbs

Advertisement

6
PROCEDURES AND SETTINGS BEFORE SYSTEM
OPERATION

CHAPTER6 PROCEDURES AND SETTINGS BEFORE

This chapter describes the procedures and settings before the operation of the safety
remote I/O module.

6.1 Procedures and Settings before System Operation

This section describes the procedures before the operation of the safety remote I/O
module and the replacement of the module.

6.1.1 Procedure from module installation to system operation

Figure 6.1 shows the procedure from the installation of the safety remote I/O module to the
CC-Link Safety system operation.
Parameters are considered to be set separately.
For the parameter setting, refer to CHAPTER 5.
For the connection between the safety CPU module and GX Developer, refer to the "GX
Developer Version 8 Operating Manual (Safety Programmable Controller)".
Module installation
Install the remote I/O module to a control panel and a machine.
Power supply wiring
Wire the power supply to the safety remote I/O module.
Self-loopback test execution
Execute the self-loopback test of the safety remote I/O module.
Switch setting
Save the settings for the link ID, station number and transmission speed setting
switch of the safety remote I/O module to the nonvolatile memory inside the module.
Module wiring*1
Turn OFF the power supply of the safety remote I/O module and wire to the
followings.
• Various types of safety devices
• Safety master module
*1: Even when safety devices are not connected, wire an external power supply terminal (I/O 24V, I/O 24G).
When the external power supply terminal (I/O 24V, I/O 24G) is not wired, an error of the external power supply occurs.
For error details, refer to Section 9.5.
6
- 1
6.1 Procedures and Settings before System Operation
6.1.1 Procedure from module installation to system operation
SYSTEM OPERATION
Start
(To next page)
For the mounting and installation of
the safety remote I/O module, refer
to Section 6.2.
For the procedure of the self-
loopback test, refer to Section 6.4.
For the switch setting, refer to
Section 6.6.
For the wiring of the safety remote
I/O module, refer to the "Safety
Application Guide".

Advertisement

Table of Contents

   Also See for Mitsubishi Electric MELSEC QS SERIES

   Related Manuals for Mitsubishi Electric MELSEC QS SERIES

Comments to this Manuals

Symbols: 0
Latest comments: