Framing Requirements - Valor 1100JN Installation & Owner's Manual

H5 series, direct vent zero clearance gas fireplaces, natural/propane gas
Table of Contents

Advertisement

QUALIFIED
INSTALLER
Note: If using optional
LDK HeatShift Duct Kit,
refer to LDK instructions
packed with kits as
framing is aff ected.
1/2" thick non-combustible
board required above engine
(not supplied). See page
NOTE: This unit requires
a solid platform to support
it. Combustible framing
allowed beneath fireplace.
Please note that any shims
used underneath to raise
the heater should be set
back 1/2" behind front face
of framing otherwise top
face of shims may be visible.
29" between underside
of non-combustible board
and base of heater.
30

Framing Requirements

31.
*
Any surface directly in front
of the unit which is at a height
of less than 4" from the bottom
of the unit must be non-combustible.
Between underside of header and
base of heater. Base of heater must
be at finished hearth height. However,
please note that the 1140 4-sided
trim extends 1-1/2" below the base
of heater. Increase cavity height
accordingly.
40"
40"
*
- Rear Vent: 16-1/2"
- Top Vent: 17-1/2", 20"
when using LDK
HeatShift
- May be reduced
by thickness of
additional
non-combustible
wall finish applied
on top of 1/2"
non-combustible
board when using
trims other than the
1130 Fixed Frame
except when using
LDK w/top vent