Valor 1100JN Installation & Owner's Manual page 48

H5 series, direct vent zero clearance gas fireplaces, natural/propane gas
Table of Contents

Advertisement

QUALIFIED
INSTALLER
Installation
1. Unpack the 1130 kit checking that you have all the
pieces on hand.
Upper
panel
RH side
panel
Lower panel
Kit content
2. On the top of the appliance's case in front of the
stand-off s, remove the positioning brackets (2
screws each).
3. At the bottom of the appliance case, install the lower
panel provided with the kit, as indicated (3 nuts).
48
LH side
door
RH side
door
Removable
LH
panel
side
panel
Barrier
screen
On top, each side of
the window, remove the
convection brackets (1 nut/
side); they are not used with
this kit.
Installation
4. On the appliance, install the side panels as
indicated (3 screws per side).
5. Install the
upper panel
as indicated
(2 screws).
6. Slide the
appliance
into the
framing and
fi x it to the
studs on each side (6 fi xing points per side).
7. Set aside the side doors, removable panel and
barrier screen to install later when the appliance's
set-up and wall fi nish application are completed.
Continue the installation of the heater as indicated
in this manual.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1150jlp1100jp1150jln

Table of Contents