BATTERY/CHARGING SYSTEM
OPERATING INSPECTION
Check for continuity between the A and B terminals.
There is usually no continuity, there should be con-
tinuity when the battery is connected to C (+) and D
(-) terminals.
INSTALLATION
Install the main relay in the reverse order of
removal.
15-13