2.4 Dielectric Strength (HIPOT) Testing
For dielectric strength (HIPOT) testing in the field, users must remove the metal
jumper located across terminals 2, 4, and 6 of the power supply terminal block.
This metal jumper connects transient suppression circuitry to chassis ground and
must be removed in order to avoid damage to transient suppression circuitry
during HIPOT testing. Figure 23 shows the proper HIPOT test connections and
should be followed to avoid damage to the device.
Figure 23: Dielectric Strength (HIPOT) Testing
RuggedCom®
23
RuggedSwitch RSG2300 Installation Guide Rev108
Installation
Need help?
Do you have a question about the RuggedSwitch RSG2300 and is the answer not in the manual?
Questions and answers