Gas 310 ECO PRO - Gas 610 ECO PRO
10 Checklists
10.1 Checklist for commissioning
No. Work to be undertaken for commissioning
1
Filling the central heating system with water and checking the water pressure
2
Fill the siphon with water
3
Vent the air in the heating system
4
Checking the water-side connections for tightness
5
Checking the type of gas supplied. Checking that the boiler is suitable for the gas
supplied?
6
Checking the gas supply pressure
7
Checking the capacity of the gas meter
8
Checking the tightness of the connections and the gas pipes
9
Purge the gas supply pipe of the boiler
10
Checking the electrical connections
11
Checking the air supply connections and flue gas discharge connections
12
Checking the functioning and operational status of the boiler
13
Checking the air/gas ratio
14
Remove the measuring device and close the measurement points
15
Attaching the Gas Type sticker
16
Reapply the casing on the inspection side
17
Set the boiler regulation to the desired values
18
Instruct the user and hand over the necessary documents
19
Confirmation of commissioning
Date
Company name, signature of engineer
160514 - 125467-05
10. Checklists
Confirmation / Measured
values
(dd-mm-yy)
77