Connection Possibilities For The Pcb (Scu- S05) - REMEHA Gas 310 ECO PRO-285 Installation, User And Service Manual

Gas 310 eco pro series, gas 610 eco pro series
Table of Contents

Advertisement

4. Installation
FgV
N L
FgV
N
L
R000303-A
HdV
N L
HdV
N L
R000304-A
EgV
N L
EgV
N L
R000305-A
42
4.7.10.
X1
X2
X3
FgV
HdV
EgV
Pump
N L
N L
N L
N L
FgV
HdV
EgV
Pump
N
L
N L
N L
N
L
¼To set the parameter selected: See the Installation and service
manual HMI Gas 310/610 ECO PRO for comprehensive operating
instructions.
n Flue gas damper control (FgV)
Not applicable.
n Hydraulic valve control (HdV)
In a cascade configuration, a hydraulic valve prevents heat loss when
the boiler is not running. Connect the hydraulic valve to the HdV
terminals of the terminal strip. The running time of the hydraulic valve
must be programmed with parameter p30.
n Control of external gas valve (EgV)
If there is a heat demand, an alternating voltage of 230 VAC, 1 A
(maximum) becomes available on the EgV terminals of the connector
to control an external gas valve.
Connection possibilities for the PCB (SCU-
S05)
SCU-S05
X4
X5
X6
Status
Status
0-10
Ctrl
Nc C
No
Nc C
No
0
+
0
+
0
Nc C
No
Nc C
No
0
+
0
+
0 S
CAUTION
On removing this PCB, the boiler will show fault code
e[38. To prevent this fault, an auto-detect must be
carried out after removing this PCB.
Gas 310 ECO PRO - Gas 610 ECO PRO
X9
X8
X7
Wps
S
+
Tout
Gps
VPS
+
Tout
Gps
VPS
T003684-C
160514 - 125467-05

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents