1
Installing the Pump
Installing the Nano Pump
Preparations
Parts required
When opening capillary or tube fittings solvents may leak out. Please observe
WA RN ING
appropriate safety procedures (for example, goggles, safety gloves and protective
clothing) as described in the material handling and safety data sheet supplied by the
solvent vendor, especially when toxic or hazardous solvents are used.
Ensure the line power switch at the front of the pump is off.
NO TE
12
Locate bench space
Provide power connections
Unpack the pump
Pump
Parts from accessory kit (see "Nano Pump Accessory Kit Content
G2226-68705" on page 5)
Power cord, for other cables see text below and "Cable Overview" on page 174
ChemStattion and/or Control module G1323A/B
1100 Series Nano Pump Service Manual