Exchanging the Power Supply
Frequency
Tools required
Parts required
1 Remove the pump from the stack, remove the front cover, top cover and top
2 Remove the EMPV. For this disconnect first:
3 Remove the flow sensor. For this disconnect first:
4 Unclip the mixing chamber from its holder.
5 Remove the damper and the Z-panel. For this disconnect first:
6 Remove both pump assemblies. For this, disconnect first:
1100 Series Nano Pump Service Manual
If defective
• Screwdriver Pozidriv #1
• Wrench 1/4 inch
• Wrench 14 mm
• Wrench 7 mm
• Wrench 5 mm
Power supply 0950-2528
foam section (see "Removing the Top Cover and Foam" on page 131).
•
the capillary going to the flow sensor.
•
the capillary coming from the filter.
•
the waste tube.
•
the connector.
•
the capillary coming from the EMPV.
•
the capillary on the injection device (port 1).
•
the connector.
•
the mixing capillary.
•
the capillary going to the mixer.
•
the active inlet valve cable at the Z-panel.
•
the connector (P16, P11, P20) at the main board (see Figure 22 on page
135).
•
the capillary coming from the mixing chamber.
•
the connecting tube coming from the solvent selection valve.
•
the connector (P8, P21 and P12, P14) at the main board.
Repairing the Pump
147
3