Rubber Grommet Installation Instructions - Eaton PowerXL DG1 Installation Manual

Variable frequency drive
Hide thumbs Also See for PowerXL DG1:
Table of Contents

Advertisement

Chapter 6—Installation requirements

Rubber grommet installation instructions

Step 1: Measure the outside diameter of the cable (D1)
used to connect to the drive.
D1 (Cable)
Step 2: Measure the outside diameter of the
rubber grommet (D2) and select a suitable
D2 (D1 ≤ D2 ≤ D1 + 2 mm).
D2 (Grommet)
Step 3: Cut the rubber grommet at the selected diameter.
D1
D2
D1 + 2 mm
Step 4: Run the cable through the rubber grommet.
42
POWERXL SERIES VFD MN040002EN—February 2018 www.eaton.com
Step 5: Insert the rubber grommet into the conduit plate
together with the cable.
Step 6: Fasten the rubber grommet and cable with a
self-locking cable tie.
Self-Locking Cable Ties

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerxl dh1Powerxl dg1 seriesPowerxl dg1-323d7fb-c21cPowerxl dg1-324d8fb-c21cPowerxl dg1-326d6fb-c21cPowerxl dg1-327d8fb-c21c ... Show all

Table of Contents