Shutdown

Shutdown
Shutdown
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Press
to stop the pumps.
2. Turn off all heat zones.
3. Relieve pressure.
Pressure Relief Procedure, page
4. Press
to park the Component A and
Component B pumps. The park operation is
complete when green dot goes out. Verify the
park operation is complete before moving to next
step.
5. Press
to deactivate the system.
334946C
See
48.
6. Turn off the air compressor, air dryer, and
breathing air.
7. Turn main power switch OFF.
To prevent electric shock do not remove any covers
or open the electrical enclosure door while the
power is ON.
8. Close all fluid supply valves.
9. Set PRESSURE RELIEF/SPRAY valves to
SPRAY to seal out moisture from the drain line.
10. Engage gun piston safety lock then close fluid
inlet valves A and B.
Fusion
Fusion
Fusion
Shutdown
Probler
Probler
Probler
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 2 h-50Reactor 2 h-50 eliteReactor 2 h-xp2Reactor 2 h-xp2 eliteReactor 2 h-xp3Reactor 2 h-40 elite ... Show all

Table of Contents