15.4.8.2
Line distance protection REL670 2.2 IEC
Application manual
QB1
QA1
DB_BUS_A
QB61
QB9
IEC04000518 V1 EN-US
Figure 359:
Switchyard layout double circuit breaker
For a double circuit-breaker bay, the modules DB_BUS_A, DB_LINE and
DB_BUS_B must be used.

Configuration setting

For application without QB9 and QC9, just set the appropriate inputs to open state
and disregard the outputs. In the functional block diagram, 0 and 1 are designated
0=FALSE and 1=TRUE:
QB9_OP = 1
QB9_CL = 0
QC9_OP = 1
QC9_CL = 0
If, in this case, line voltage supervision is added, then rather than setting QB9 to
open state, specify the state of the voltage supervision:
QB9_OP = VOLT_OFF
QB9_CL = VOLT_ON
If there is no voltage supervision, then set the corresponding inputs as follows:
VOLT_OFF = 1
VOLT_ON = 0
QB2
QC1
QA2
QC2
QB62
QC9
Section 15
Control
WA1 (A)
WA2 (B)
QC4
DB_BUS_B
QC5
QC3
DB_LINE
en04000518.vsd
M13584-4 v4
M13584-6 v5