Section 11
11.1

Overview

The IED can support synchrophasor data communication via IEEE C37.118 and/or IEEE1344 with
maximum 8 TCP clients and 6 UDP client groups, simultaneously.
The rear OEM ports are used for IEEE C37.118/1344 communication. The same ports can also be
used for substation bus (IEC 61850-8-1) communication and process bus (IEC/UCA 61850-9-2LE)
communication where applicable.
In order to establish a connection between PMU and a TCP/UDP client (PDC client), an Ethernet
communication link (e.g. optical fiber) shall be available and the required parameters on both PMU
and the TCP/UDP client shall be set. For the purpose of this section, an Open PDC tool (PMU
Connection Tester) installed on a PC is used as the TCP/UDP client.
11.2

Setting the PMU station communication (PMU Report)

1.
Check the settings for the PMU Report parameters by navigating to: Main menu /
Configuration /Communication /Station communication /phasor measurement /PMU
Report /PMUREPORT:1
1.1. Make sure that the operation of at least one PMU instance (e.g. PMU1) is On.
1.2. Enable sending the frequency data by setting the parameter SendFreqInfo to On.
2.
Check the operation of the required phasor channels (PHASORREPORT) by navigating to:
Main menu /Configuration /Communication /Station communication /phasor
measurement /PMU Report /PHASORREPORT:x .
11.3
Setting the PMU station communication (PMU
configuration)
To enable IEEE C37.118/1344 communication, the corresponding OEM ports must be activated. The
galvanic Ethernet front port and the rear optical ports can be used for IEEE C37.118/1344
communication.
To enable IEEE C37.118/1344 synchrophasor communication:
1.
Enable communication for by navigating to: Main menu /Configuration /Communication /
Ethernet configuration .
1.1. Select the port.
1.2. Set values for Mode, IPAddress and IPMask. Mode must be set to Normal.
1.3. Check that the correct IP address is assigned to the port.
2.
Set the TCP communication parameters by navigating to: Main menu /Configuration /
Communication /Station communication /phasor measurement /PMU Configuration /
Generator protection REG670
Commissioning manual
Establishing connection and
verifying the IEEE C37.118/1344
communication
© 2017 - 2021 Hitachi Power Grids. All rights reserved

Establishing connection and verifying the IEEE C37.118/1344 communication

Section 11
GUID-EFD77C28-6F7C-4277-8C7E-30E78CC8EFAD v3
GUID-B8DCD7BA-AEBA-4977-89D4-2F18ECE34A2F v1
GUID-B4BA9F74-5E28-42FC-8F33-0BC98D5AE6B0 v2
107

Advertisement

Table of Contents
loading

Table of Contents