Establishing Connection And Verifying The Ieee C37.118/1344 Communication; Overview; Setting The Pmu Station Communication (Pmu Report); Setting The Pmu Station Communication (Pmu Configuration) - ABB Relion 670 Series Commissioning Manual

Line differential protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 505 378-UEN Rev. H
Section 9
9.1

Overview

The IED can support synchrophasor data communication via IEEE C37.118 and/or IEEE1344
with maximum 8 TCP clients and 6 UDP client groups, simultaneously.
The rear OEM ports are used for IEEE C37.118/1344 communication. The same ports can also
be used for substation bus (IEC 61850-8-1) communication and process bus (IEC/UCA
61850-9-2LE) communication where applicable.
In order to establish a connection between PMU and a TCP/UDP client (PDC client), an
Ethernet communication link (e.g. optical fiber) shall be available and the required parameters
on both PMU and the TCP/UDP client shall be set. For the purpose of this section, an Open
PDC tool (PMU Connection Tester) installed on a PC is used as the TCP/UDP client.
9.2

Setting the PMU station communication (PMU Report)

1.
Check the settings for the PMU Report parameters by navigating to: Main menu/
Configuration/Communication/Station communication/phasor measurement/PMU
Report/PMUREPORT:1
1.1.
1.2.
2.
Check the operation of the required phasor channels (PHASORREPORT) by navigating to:
Main menu/Configuration/Communication/Station communication/phasor
measurement/PMU Report/PHASORREPORT:x.
9.3
Setting the PMU station communication (PMU
configuration)
To enable IEEE C37.118/1344 communication, the corresponding OEM ports must be activated.
The galvanic Ethernet front port and the rear optical ports can be used for IEEE C37.118/1344
communication.
To enable IEEE C37.118/1344 synchrophasor communication:
1.
Enable communication for by navigating to: Main menu/Configuration/
Communication/Ethernet configuration.
1.1.
1.2.
1.3.
2.
Set the TCP communication parameters by navigating to: Main menu/Configuration/
Communication/Station communication/phasor measurement/PMU Configuration/
Line differential protection RED670
Commissioning manual
Establishing connection and
verifying the IEEE C37.118/1344
communication
Make sure that the operation of at least one PMU instance (e.g. PMU1) is
Enable sending the frequency data by setting the parameter
Select the port.
Set values for
Mode , IPAddress and IPMask . Mode must be set to Normal .
Check that the correct IP address is assigned to the port.
© Copyright 2017 Hitachi Power Grids. All rights reserved

Establishing connection and verifying the IEEE C37.118/1344 communication

Section 9
GUID-EFD77C28-6F7C-4277-8C7E-30E78CC8EFAD v3
GUID-B8DCD7BA-AEBA-4977-89D4-2F18ECE34A2F v1
On .
SendFreqInfo to On .
GUID-B4BA9F74-5E28-42FC-8F33-0BC98D5AE6B0 v2
71