Related Documentation from Texas Instruments
Related Documentation from Texas Instruments
The following table contains a list of data manuals that have detailed descriptions of the integrated circuits
used in the design of the TAS3108EVM2. The data manuals can be obtained at the URL
http://www.ti.com.
Additional Documentation
1. TAS3108EVM2 Application Report
2. Graphical Development tool (GDE) for TAS3108 (GDE version 1.11 or later)
3. General Application Notes
Trademarks
PurePath Digital is a trademark of Texas Instruments.
All other trademarks are the property of their respective owners.
6
Read This First
Table 1. Related Documentation from Texas Instruments
PART NUMBER
TAS3108
TLV1117-33
TPS3825-33
LITERATURE NUMBER
SLES152
SLVS561
SLVS165
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?