Electrostatic Discharge Warning
2.1
Electrostatic Discharge Warning
Many of the components on the TAS3108EVM2 are susceptible to damage by electrostatic discharge
(ESD). Customers are advised to observe proper ESD handling precautions when unpacking and handling
the EVM, including the use of a grounded wrist strap at an approved ESD workstation.
CAUTION
Failure to observe ESD handling procedues may result in damage
to EVM components.
2.2
Unpacking the EVM
Upon opening the TAS3108EVM2 package, please ensure that the following items are included:
• One TAS3108EVM2 board using one TAS3108DCP
• One TI input-USB board for interfacing TAS3108EVM2 with SPDIF receiver and eight-channel
analog-to-digital converter and USB for PC control
• One TI DAC8-DIT2 board for interfacing TAS3108EVM2 with SPDIF transmitter and digital-to-analog
converter outputs and power-supply regulators
• Two signal interface IDC cables for connection to an I2S back-end like the attached TI DAC8-DIT2
board, 14 pin
• Two control interface IDC cables for connection to an I2C back-end like the attached TI DAC8-DIT2
board, 34 pin
• One cable for connecting input-USB board to a USB port on a PC for TAS3108 control by software
• One cable for connecting DAC8-DIT2 board to the power supplies
• One PurePath CD-ROM containing data sheets, application notes, user's guides, gerber files, and PC
software tools
If any of these items are missing, please contact the Texas Instruments Product Information Center
nearest you to obtain a replacement.
Connect the input-USB board to TAS3108EVM2 using the two included delivered IDC cables. Connect
TAS3108EVM2 board to DAC8-DIT2 board using the two included IDC cables.
14
Quick Setup Guide
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?