www.ti.com
6.1
As a Reference Design
As a reference design, the ADS8481EVM contains the essential circuitry to showcase the analog-to-digital
converter. This essential circuitry includes the input amplifier, reference circuit, and buffers. The
ADS8481EVM analog input circuit is optimized for a wide bandwidth signal; therefore, the user may need
to adjust the input buffer circuitry to better suit your needs. In AC-type applications where signal distortion
is a concern, the user should use high quality capacitors such as Mica, polypropylene or COGs type
capacitors in the signal path. In applications where the input is multiplexed, the A/D input resistor and
capacitor may need to be adjusted further.
6.2
As a Prototype Board
As a prototype board, the ADS8481EVM features amplifiers in a standard 8-pin SOIC package and many
resistor pads scatter around allowing the user to experiment with a host of circuits, as needed. The
ADS8481EVM can be used to evaluate both dual- and single-supply amplifiers in both inverting and
non-inverting configurations. The ADS8481EVM comes installed with a dual-supply amplifier which allows
the user to take advantage of the full input voltage range of the converter. For applications that require
signal supply operation and smaller input voltage range, the THS4031 can be replaced with the
single-supply amplifier like the OPA300 or OPA350. Pad jumper SJP3 should be shorted between pads 1
and 2. This shorts the minus supply pin of the amplifier to ground. Positive supply voltage can be applied
at test point TP4 or at connector J5 pin 1.
6.3
As a Software Test Platform
As a software test platform, connectors P1, P2, and P3 plug into the parallel interface connectors of the
5-6K interface board. The 5-6K interface board sits on the C5000 and C6000 digital signal processor
starter kits (DSK). The ADS8481EVM is mapped then into the processor's memory space. The 5-6k
interface board also provides an area for signal conditioning. This area can be used to install application
circuit(s) for digitization by the ADS8481 analog-to-digital converter. For more information, see the 5-6K
Interface Board user's guide (SLAU104) .
For the software engineer, the ADS8481EVM provides a simple platform for interfacing to the converter.
The EVM provides standard 0.1-inch headers and sockets to wire into prototype boards. The user need
only provide three address lines (A2, A1, and A0) and address valid line (DC_CS) to connector P2. To
select which address combinations generate RD and CONVST, set jumpers as shown in
that the Chip Select (CS) signal is not memory-mapped or tied to P2; therefore, it must be controlled by a
general-purpose pin or shorted to ground at J3 pin 1. If address decoding is not required, the EVM
provides direct access to converter data bus by P3 and control by J3.
7
Related Documentation from Texas Instruments
To obtain a copy of any of the following TI documents, call the Texas Instruments Literature Response
Center at (800) 477-8924 or the Product Information Center (PIC) at (972) 644-5580. When ordering,
identify this user's guide by its title and literature number. Updated documents can also be obtained
through the TI Web site at www.ti.com.
Data Sheets:
ADS8481
REF3240
REF3225
SN74AHC138
SN74AHC245
SN74AHC1G04
THS4031
THS4032
SLAU182A – June 2006 – Revised September 2006
Submit Documentation Feedback
Literature Number:
SLAS385
SBVS058
SBVS058
SCLS258
SCLS230
SCLS318
SLOS224
SLOS224
Related Documentation from Texas Instruments
ADS8481EVM
Table
4. Recall
7
Need help?
Do you have a question about the ADS8481EVM and is the answer not in the manual?