Control Interface (J11), Input
3.1
Control Interface (J11), Input
This interface connects the TAS3108EVM2 board to a TI input-USB board. This is a general-purpose
interface, so not all signals are used by the TAS3108. Unused signals are shaded in
NET-NAME AT
PIN NO.
SCHEMATICS
1
GND
2
RESERVED
3
GND
4
RESET
5
RESERVED
6
MUTE
7
PDN
8
RESERVED
9
RESERVED
10
SDA
11
GND
12
SCL
13
GPIO1
14
GPIO2
15
GPIO3
16
GPIO4
17
GND
18
GPIO5
19
GPIO6
20
SD
21
RESERVED
22
OTW
23
RESERVED
24
RESERVED
25
GND
26
GND
27
RESERVED
28
RESERVED
29
RESERVED
30
RESERVED
31
GND
32
GND
33
+5V
34
+5V
18
System Interfaces
Table 3-1. J11 Pin Description
Ground
Ground
System reset (bidirectional). Activate MUTE before RESET for quiet reset.
Ramp volume from any setting to noiseless soft mute. Mute can also be activated by I2C.
Power down. TAS3108 goes ino power down state when activated.
I2C data clock
Ground
I2C bit clock
General-purpose input/output 4, used to reset the TAS3108 after programming.
Ground
Shutdown reporting. Used for speaker-output EVMs.
Temperature warning. Used for speaker-output EVMs.
Ground
Ground
Ground
Ground
+5-Vdc power supply (output)
+5-Vdc power supply (output)
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
Table
DESCRIPTION
Submit Documentation Feedback
www.ti.com
3-1.
Need help?