www.ti.com
1.4
Output Board
• Eight-channel digital-to-analog converter, two PCM4104 devices, automatic sample-rate detection, and
supports 44.1 kHz, 48 kHz, and 96 kHz in this application. Relation between master clock and sample
rate clock must be 256. 4-Vrms for 0-dB and 116-dB DYR A-weighted.
• Two-channel digital audio output, SPDIF format, DIT4192, optical and electrical output
• ±12-V and 5-V power-supply regulators
The physical structure of the output DAC8-DIT2 board is illustrated in
Figure 1-4. Physical Structure for Output DAC8-DIT2 Board Outline
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
Submit Documentation Feedback
Figure
1-4.
+/-15 V Power Supply Connector
ANALOG OUTPUT - Ch 1 and 2
ANALOG OUTPUT - Ch 3 and 4
ANALOG OUTPUT - Ch 5 and 6
ANALOG OUTPUT - Ch 7 and 8
SPDIF Output - Optical
SPDIF Output - Coaxial
SPDIF DATA OUT select
SDIN1
SDIN2
SDIN3
Output Board
SDIN4
Overview
11
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?