Connectors on the DAC8-DIT2 Board
3.6.2 3.6.2 SPDIF Coax
The SPDIF input for coax is shown in
PIN NO.
NET-NAME AT
SCHEMATICS
1
GND
2
IN1
3
IN1
4
IN1
26
System Interfaces
Figure
3-8.
2
1
4
PCB Connector (Top View)
Figure 3-8. J62 Pin Numbers
Table 3-11. J62 Pin Description
Ground
Coax SPDIF output
Coax SPDIF output
Coax SPDIF output
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
3
DESCRIPTION
Submit Documentation Feedback
www.ti.com
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?