Summary of Contents for Texas Instruments TAS3108EVM2
Page 1
TAS3108EVM2 User's Guide Evaluation Module for the TAS3108 Digital Audio Signal Processor User's Guide NOVEMBER 2006 Digital Audio and Video Products SLEU065A...
Page 2
TAS3108EVM2 User's Guide Evaluation Module for the TAS3108 Digital Audio Signal Processor User's Guide Literature Number: SLEU065A SEPTEMBER 2005 – Revised NOVEMBER 2006...
Page 4
List of Figures ..................... TAS3108EVM2 System ............Physical Structure for the TAS3108EVM2 (Rough Outline) ......................Input Board Outline ............. Physical Structure for Output DAC8-DIT2 Board Outline ......................Complete System ....................TAS3108 GDE Window ....................J200… J203 Pin Pumbers ......................J140 Pin Numbers ....................
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006 Read This First About This Manual This manual describes the operation of the TAS3108EVM2 evaluation module from Texas Instruments. How to Use this Manual This document contains the following chapters: Chapter 1 - Overview...
Related Documentation from Texas Instruments The following table contains a list of data manuals that have detailed descriptions of the integrated circuits used in the design of the TAS3108EVM2. The data manuals can be obtained at the URL http://www.ti.com. Table 1. Related Documentation from Texas Instruments...
Chapter 1 SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006 Overview The TAS3108EVM2 PurePath Digital™ customer evaluation amplifier module demonstrates the digital audio processor TAS3108/TAS3108IA from Texas Instruments (TI). TAS3108DCP/TAS3108IADCP is a fully programmable high-performance audio processor. It uses an efficient, custom, multi-instruction programming environment...
TAS3108 EEPROM Optical and Optical and Coaxial Coaxial I2S Bus I2S Bus S/PDIF Ouput S/PDIF Input Example Example TI Input-USB Board TI DAC-DIT Board Figure 1-1. TAS3108EVM2 System Overview SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006 Submit Documentation Feedback...
Figure 1-2. Figure 1-2. Physical Structure for the TAS3108EVM2 (Rough Outline) U41 is the TAS3108 device. U33 is the EEPROM for program and coefficient storage. Digital audio data (I2S) is input on J12 and output on J22. J11 is used for I2C control, reset signal, and power-supply voltage.
www.ti.com Input Board Input Board The input board contains an eight-channel ADC, SPDIF receiver, and USB connection. Buttons for MUTE, RESET, and selection between 48-kHz and 96-kHz sample rate. Physical structure for the input-USB board is illustrated in Figure 1-3. USB Connector USB Connect or RESET Button (Board)
www.ti.com Output Board Output Board • Eight-channel digital-to-analog converter, two PCM4104 devices, automatic sample-rate detection, and supports 44.1 kHz, 48 kHz, and 96 kHz in this application. Relation between master clock and sample rate clock must be 256. 4-Vrms for 0-dB and 116-dB DYR A-weighted. •...
Output Board A picture of the complete system is shown in Figure 1-5. The input board is to the left, the TAS3108EVM2 is in the middle, and the output board is to the right. Figure 1-5. Complete System Overview SLEU065A –...
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006 Quick Setup Guide This chapter describes the TAS3108EVM2 board, with regard to power supplies and system interfaces. The chapter provides information regarding handling and unpacking, absolute operating conditions, and a description of the factory default switch and jumper configuration.
Electrostatic Discharge Warning Electrostatic Discharge Warning Many of the components on the TAS3108EVM2 are susceptible to damage by electrostatic discharge (ESD). Customers are advised to observe proper ESD handling precautions when unpacking and handling the EVM, including the use of a grounded wrist strap at an approved ESD workstation.
Power Supply Setup Power Supply Setup The TAS3108EVM2 is powered via the DAC8-DIT2 board or another output board, like a TAS5086-5186EVM. The DAC8-DIT2 board generates a +5-V supply that is fed to the TAS3108EVM2. The +5-V supply is further regulated to +3.3 V with the aid of a low-dropout linear regulator, U31.
3. Start GDE program from the Windows Start menu. Startup of GDE requires a few seconds. Figure 2-1. TAS3108 GDE Window To test the connection from PC to EVM, load the TAS3108EVM2 test file (helloworld.pfw), located in C:\Program Files\Texas Instruments Inc\TAS3108 Development Tools\Examples\HelloWorld.pfw.
Chapter 3 SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006 System Interfaces This chapter describes the TAS3108EVM2 board regard to power supplies and system interfaces....................Topic Page ............Control Interface (J11), Input ..........Digital Audio Interface, Input (J12) ............
Control Interface (J11), Input Control Interface (J11), Input This interface connects the TAS3108EVM2 board to a TI input-USB board. This is a general-purpose interface, so not all signals are used by the TAS3108. Unused signals are shaded in Table 3-1.
www.ti.com Digital Audio Interface, Input (J12) Digital Audio Interface, Input (J12) The digital audio interface contains digital audio signal data (I2S), clocks, etc. See the TAS3108 data manual for signal timing and details not covered in this document. Table 3-2. J12 Pin Description NET-NAME AT DESCRIPTION NUMBER...
Control Interface, Output (J21) Control Interface, Output (J21) This interface connects the TAS3108EVM2 board to a TI DAC8-DIT2 output board or a general amplifier power EVM. This is a general-purpose interface, so not all signals are used by the TAS3108. Unused...
www.ti.com Digital Audio Interface, output (J22) Digital Audio Interface, output (J22) The digital audio interface contains digital audio signal data (I2S), clocks, etc. See the TAS3108 data manual for signal timing and details not covered in this document. Table 3-4. J22 Pin Description PIN NO.
www.ti.com Connectors on the Input-USB board Figure 3-4. AP PSIA Settings Using External I2S Source Figure 3-5. AP PSIA Interface Pin Numbers Table 3-7. AP PSIA Pin Description NET-NAME AT DESCRIPTION PIN NO. SCHEMATICS MCLK MCLK Source From MCLK source MCLK Out MCLK output Ground...
www.ti.com Connectors on the Input-USB board Table 3-7. AP PSIA Pin Description (continued) NET-NAME AT DESCRIPTION PIN NO. SCHEMATICS SDATA4 SDATA4 Source From SPDIF or analog channels 7 and 8 SDATA4 Out SDATA4 output SDATA1 Out Connected to SDATA1 Out 3.5.4 I2C Connector (J301) PCB Connector (Top View) Figure 3-6.
www.ti.com Connectors on the DAC8-DIT2 Board Table 3-9. J800 Pin Description (continued) PIN NO. NET-NAME AT DESCRIPTION SCHEMATICS GPIO6 General-purpose port for GUIs Shutdown reporting Shutdown reporting Temperature warning Temperature warning RESERVED Ground Ground RESERVED RESERVED RESERVED RESERVED Ground Ground +5-Vdc power supply (output) +5-Vdc power supply (output) Connectors on the DAC8-DIT2 Board...
www.ti.com Connectors on the DAC8-DIT2 Board 3.6.2 3.6.2 SPDIF Coax The SPDIF input for coax is shown in Figure 3-8. PCB Connector (Top View) Figure 3-8. J62 Pin Numbers Table 3-11. J62 Pin Description PIN NO. NET-NAME AT DESCRIPTION SCHEMATICS Ground Coax SPDIF output Coax SPDIF output...
Page 27
EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation kit being sold by TI is intended for use for ENGINEERING DEVELOPMENT OR EVALUATION PURPOSES ONLY and is not considered by TI to be fit for commercial use. As such, the goods being provided may not be complete in terms of required design-, marketing-, and/or manufacturing-related protective considerations, including product safety measures typically found in the end product incorporating the goods.
TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products...
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?
Questions and answers