Texas Instruments TAS3308EVM User Manual
Texas Instruments TAS3308EVM User Manual

Texas Instruments TAS3308EVM User Manual

Evaluation module for the tas3308 digital audio signal processor

Advertisement

Quick Links

TAS3308EVM
Evaluation Module for the
TAS3308 Digital Audio Signal Processor
User's Guide
March 2008
Digital Audio & Video Products
SLEU093

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS3308EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TAS3308EVM

  • Page 1 TAS3308EVM Evaluation Module for the TAS3308 Digital Audio Signal Processor User's Guide March 2008 Digital Audio & Video Products SLEU093...
  • Page 2 TAS3308EVM Evaluation Module for the TAS3308 Digital Audio Signal Processor User's Guide Literature Number: SLEU093 March 2008...
  • Page 3: Table Of Contents

    Contents ..........................Preface ........................Overview .................... TAS3308EVM Features .................... PCB Component Map ....................Quick Setup Guide ................Electrostatic Discharge Warning ....................Unpacking the EVM ....................Power Supply Setup ..................Digital Audio Inputs/Outputs ................... Master/Slave Mode Operation ....................2.5.1 Master Mode ....................
  • Page 4 List of Figures ...................... TAS3308EVM System ..................... TAS3308EVM System ..................TAS3308EVM Component View ........................ GDE Startup .................. Setting the I C Initialization Sequence ................Specifying the I C Initialization Sequence ....................Loading a Process Flow ..................Loading a Process Flow (Part B) ....................
  • Page 5: Preface

    Related Documentation From Texas Instruments The following table contains a list of data manuals that have detailed descriptions of the integrated circuits used in the design of the TAS3308EVM. The data manuals can be obtained at the URL http://www.ti.com. Related Documentation from Texas Instruments...
  • Page 6 Additional Documentation Additional Documentation 1. Graphical Development tool (GDE) for TAS3308 (GDE ver. 1.7 or later) 2. General Application Notes Trademarks Equibit™ and PurePath Digital™ are trademarks of Texas Instruments. Read This First SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 7: Overview

    Chapter 1 SLEU093 – March 2008 Overview The TAS3308EVM PurePath Digital™ customer evaluation module demonstrates the Digital Audio Processor TAS3308 from Texas Instruments (TI). TAS3308 is a fully programmable high-performance audio processor. It uses an efficient, custom, multi-instruction programming environment optimized for digital audio processing algorithms. The TAS3308 architecture provides high-quality audio processing by using a 48-bit data path, 28-bit filter coefficients, and a single-cycle 28 ×...
  • Page 8: Tas3308Evm Features

    TAS3308EVM Features TAS3308EVM Features • Socketed EEPROM for download of program and coefficients • 6-channel discrete I S input/4-channel I S outputs • 2-channel SPDIF receiver, optical input, into TAS3308 SDIN1 • 2-channel SPDIF transmitter, optical output from TAS3308 SDOUT1 •...
  • Page 9: Tas3308Evm System

    PWM1_RI TAS3308 PWM1_RD PWM1_LI USB In PWM1_LD TUSB USB 3.3V Control Analog GPIO1 Analog Comp GPIO2 Headphone /RESET Output /MUTE Control Analog Input Input Line Out 1 TAS3308EVM Figure 1-1. TAS3308EVM System SLEU093 – March 2008 Overview Submit Documentation Feedback...
  • Page 10: Tas3308Evm System

    EEPROM2 PWM1 CONTROLLER SHT 6 SHT 9 SHT 4 PWM2 MUTE EEPROM1 RESET-USB RESET2 SHT 9 TYPE A JACK SHT 7 SPDIF IN SPDIF OUT (OPTICAL SHEET 8 Figure 1-2. TAS3308EVM System Overview SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 11: Pcb Component Map

    PCB Component Map PCB Component Map TAS3308EVM physical structure is shown in Figure 1-3. SPDIF I2S IN SPDIF SPDIF SPDIF I2S IN SDOUT2 IN I2S OUT + 9 V -9 V Valid Fault PWM OUT 3 RI 3 RD...
  • Page 12 Overview SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 13: Quick Setup Guide

    SLEU093 – March 2008 Quick Setup Guide This chapter describes the overall TAS3308EVM board setup, power supply requirements and system interfaces. The chapter provides information regarding handling and unpacking, absolute operating conditions, and a description of the factory default jumper configuration.
  • Page 14: Electrostatic Discharge Warning

    Power Supply Setup The TAS3308EVM is powered via the ±9 V terminals or the 9 V (center hot) power connectors, PJ1 and PJ2. The TAS3308 EVM generates a 5-V, –5-V, and 3.3-V internal supplies that are fed to the TAS3308EVM components.
  • Page 15: Master/Slave Mode Operation

    The TAS3308 has an optical SPDIF input from OPTO2. This is a pass though only connection to the TAS3308 SDOUT2/SPDIF output on, OPTO3. Master/Slave Mode Operation The TAS3308EVM is delivered configured to operate in clock master mode. However, the TAS3308 can be configured as a clock slave or master using JP3. Table 2-2. JP2 Clock Master/Slave Setting...
  • Page 16: Tas3308 Software Installation

    Using the TAS3308 EVM After completing the software installation, turn on power supplies and connect USB cable to Input-USB board. To start the GDE – Go to the Start menu and select All Programs/Texas Instruments/PurePath Studio/PurePath Studio GDE. Quick Setup Guide SLEU093 –...
  • Page 17: Gde Startup

    www.ti.com TAS3308 Software Installation Figure 2-1. GDE Startup The startup of GDE takes few seconds. The TAS3308 requires an initialization configuration file to be loaded after a reset. This file configures the TAS3308 for the EVM configuration, enables the analog outputs, and sets the clock master/slave mode. Before loading or building a process flow verify that an initialization file is specified in the Execute I command file window.
  • Page 18: Specifying The I 2 C Initialization Sequence

    www.ti.com TAS3308 Software Installation Figure 2-3. Specifying the I C Initialization Sequence Then verify that the “Execute on reset” box is checked. At this point a process flow can be built using the TAS3308 application framework, the TAS3308 I/O components and the audio processing components. Building and running a process flow A good starting point is to load the predefined TAS3308 Test process flow.
  • Page 19: Loading A Process Flow

    www.ti.com TAS3308 Software Installation Figure 2-4. Loading a Process Flow SLEU093 – March 2008 Quick Setup Guide Submit Documentation Feedback...
  • Page 20: Loading A Process Flow (Part B)

    www.ti.com TAS3308 Software Installation Figure 2-5. Loading a Process Flow (Part B) This loads a process flow that streams a signal from either the ADC or SAP1 input to the PWM and SAP output. Quick Setup Guide SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 21: Gde Test Process Flow

    To build this process flow and execute it on the EVM, select Build/ Generate Code, then Build/Download code, and finally then Build/Run. When the GDE transitions to run mode, the GDE resets the TAS3308EVM. The reset restores the TAS3308 register to the default values.
  • Page 22 Quick Setup Guide SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 23: System Interfaces

    Chapter 3 SLEU093 – March 2008 System Interfaces This chapter describes the TAS3308EVM board power supplies and system interfaces....................Topic Page ..........Control Interface (Control1), Input ..........Digital Audio Interface, Input (J1) ............... PWM Output (J4) ..............Analog Input (J6) ..........
  • Page 24: Control Interface (Control1), Input

    Control Interface (Control1), Input Control Interface (Control1), Input This interface connects the TAS3308EVM board to an internal controller. This is a general-purpose interface. Table 3-1. Control1 Pin Description PIN NO. NET-NAME AT SCHEMATICs DESCRIPTION C bidirectional data line C input clock line Ground 3.3 V...
  • Page 25: Pwm Output (J4)

    www.ti.com PWM Output (J4) PWM Output (J4) Table 3-3. J4 Pin Description PIN NO. NET-NAME AT SCHEMATICS DESCRIPTION Ground 5V_PWR 5V_PWR Ground –5V_PWR –5V_PWR Ground 3.3V_PWR 3.3V_PWR Ground 3.3V_PWR 3.3V_PWR Ground VALID VALID Ground FAULT FAULT Ground Ground Ground PWM3_RI PWM3_RI Ground PWM3_RD...
  • Page 26: Analog Input (J6)

    www.ti.com Analog Input (J6) Analog Input (J6) Table 3-4. J6 Pin Description PIN NO. NET-NAME AT SCHEMATICS DESCRIPTION Ground LineIn1L Line in left channel 1 also on RCA J5 Ground LineIn1R Line in right channel 1 also on RCA J5 Ground LineIn2L Line in left channel 2...
  • Page 27: Rca Connectors

    www.ti.com RCA Connectors Table 3-5. J9 Pin Description PIN NO. NET-NAME AT SCHEMATICS DESCRIPTION Ground MCLKO Master clock input Ground SCLKout S bit clock Ground LRCLKout S left-right clock Ground SDOUT1 S data 1, channel 1 and 2 Ground SDOUT2 S data 2, channel 3 and 4 RCA Connectors Table 3-6.
  • Page 28: Jp3 Pin Description

    www.ti.com S Master Slave Jumper (JP3) Table 3-8. JP3 Pin Description PIN NO. DESCRIPTION 1, 2 S Slave 2, 3 S Master System Interfaces SLEU093 – March 2008 Submit Documentation Feedback...
  • Page 29: Msp430 Programming

    Chapter 4 SLEU093 – March 2008 MSP430 Programming This chapter describes the TAS3308EVM board power supplies and system interfaces....................Topic Page ..........Example of MSP430 Programming SLEU093 – March 2008 MSP430 Programming Submit Documentation Feedback...
  • Page 30: Example Of Msp430 Programming

    www.ti.com Example of MSP430 Programming Example of MSP430 Programming The MSP430 can be programmed to provide TAS3308 and power stage initialization and control. During Initialization the MSP430 should wait for the TAS3308 to complete booting from EEPROM. It would then send an initialization sequence to the TAS3308.
  • Page 31 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 32 EVM schematic located in the EVM User's Guide. When placing measurement probes near these devices during operation, please be aware that these devices may be very warm to the touch. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright 2008, Texas Instruments Incorporated...
  • Page 33: Important Notices

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.
  • Page 34 Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TAS3308EVM...

Table of Contents