Output Board
A picture of the complete system is shown in
is in the middle, and the output board is to the right.
12
Overview
Figure
1-5. The input board is to the left, the TAS3108EVM2
Figure 1-5. Complete System
SLEU065A – SEPTEMBER 2005 – Revised NOVEMBER 2006
www.ti.com
Submit Documentation Feedback
Need help?
Do you have a question about the TAS3108EVM2 and is the answer not in the manual?