Carrier Disassembly
1. Using a 3/16" punch drive Roll Pin (3G) holding Planet
Shaft (3E) in Carrier (3A) in Planet Shaft (3E) until it bot-
toms.
MAKE SURE ROLL PIN HAS BOTTOMED OR CARRIER MAY BE DAMAGED WHEN
PLANET SHAFT IS REMOVED.
2. Remove Planet Shaft (3E) from Carrier (3A). Use a small
punch to remove Roll Pin (3G) from Planet Shaft (3E).
3. Slide Planet Gear (3F) and two Thrust Washers (3B) out
of Carrier (3A).
4. Remove both rows of Needle Bearings (3C) and Spacer
(3D) from bore of Planet Gear (3F).
5. Repeat Steps 1 thru 4 for remaining Cluster Gears (3F).
3121298
SECTION 3 - CHASSIS & TURNTABLE
3B
Figure 3-55. Carrier Disassembly
– JLG Lift –
3G
3F
3C
3D
3E
3A
3C
3B
3-39